The unit is a large assembly and logistics facility which has been extended over time providing a mix of warehousing, office accommodation and staff amenities. Constructed in the 1980s are situated at the end of a terrace and have a steel portal frame construction, brick elevation and profile metal sheeting above. The roofs are pitched and covered with profile metal cladding.