The premises comprises an industrial unit and constructed around a steel portal frame with full height block work infill in part, and part block work infill with upper level cladding, underdrawn internally with insulation. The roof was pitched and covered in what appeared to be a single skin asbestos sheet cladding, underdrawn internally with insulation. Intermittent translucent panels did allow a good level of natural daylight into the premises. Lighting was mixed and would benefit from upgrading to low bay LED discs.
An amenity block comprising offices and wcs was accessed directly from the personnel entrance. The premises had an eaves height of 6 metres rising to 7.4 metres at the apex. The premises had a single access roller shutter which measured 4.55 metres wide by 5.12 metres high.