The subjects comprise of a substantial detached industrial unit with associated offices, car parking and yard.
The main workshop building is of a steel portal frame construction with a pitched roof over incorporating translucent roof panels. The concrete floor is 200mm with the walls and ceilings being to the inside face of the cladding. Each bay within the workshop benefits from 2 x 10T cranes which can provide a lift capacity of 20T albeit you have advised the building has been constructed to be capable of handling greater loads.
A workshop extension has been added to the north of the main workshop which was constructed in 2018 and is of similar construction also with a 10T crane. Both the workshops benefit from a circa 9M eaves along with having LED lighting installed throughout.
To the east elevation are 2 covered storage areas, one of which provides immediate access into the main workshop building.
There are 3 vehicular access doors to the property at the east elevation along with a further at the south elevation towards the end of the building.
The office and staff welfare areas are situated within a single storey building attached to the main office and are of a steel portal frame construction with a mono-pitched clad roof over with the walls being blockwork rendered externally. Internally, the space is laid out to provide changing areas, toilets, canteen and offices.
Within the offices, the walls and ceilings are painted plasterboard with artificial lighting being provided by way of CAT 2 fitments. HVAC can be found within the cellular private offices.
The unit will also benefit from a yard laid in a mix of hardcore and concrete to the north of the building and car parking to the east. ( Agency Pilot Software ref: 7037 )